Created Date Wednesday, 11 June 2014
Modified Date Tuesday, 28 July 2015
Filesize 1.22 MB
Category Research/Paper
Author

Groundwater Planning in Upper Citarum, December 2010

The basic problem of the groundwater in the Bandung Plain is the over-extraction of groundwater from the aquifers. This has resulted in a dramatic lowering of the phreatic (unconfined) groundwater table with shallow wells falling dry, a reduction of the yield of deep wells and subsidence of the ground level at certain places. The subsidence in turn has aggravated the flooding and drainage problems in the Bandung Plain. This report (2010) is written in the framework of component B3 of the project Institutional Strengthening for IWRM in the 6 Ci-s ICWRMIP (TA 7189-INO).

Created Date Wednesday, 11 June 2014
Modified Date Tuesday, 28 July 2015
Filesize 2.38 MB
Category Research/Paper
Author

Summary POLA Water Resources Management in the 6 Cis River Basin Territory, 2012

The River Basin Territory of Cidanau-Ciujung-Cidurian-Cisadane-Ciliwung-Citarum (6 Cis RBT) represents an inter-provincial river basin which managed by Center, composing of Cidanau-Ciujung-Cidurian (3 Ci) (Banten and West Java Provinces), Ciliwung-Cisadane (2 Ci) (DKI Jakarta, West Java and Banten Provinces), and Citarum (1 Ci) (West Java Province). Administratively, this river basin covers total 14 districts and 14 cities, consisting of 4 districts and 4 cities in Banten Province, 5 cities in DKI Jakarta Province, and 10 districts and 5 cities in West Java Province. Preparation of this POLA (strategic plan) refers to Ministerial Decree of Public Works. Generally preparation of this Pola is aimed to realize equal, comprehensive, and environmentally sustainable water resource management.

Created Date Wednesday, 11 June 2014
Modified Date Tuesday, 28 July 2015
Filesize 834 KB
Category Booklet
Author

West Tarum Canal Rehabilitation Information Booklet

This is the English version of the Public Information Booklet (PIB) on the rehabilitation of the West Tarum Canal (WTC). The project is one of the project of the Integrated Citarum Water Resources Management Investment Program (ICWRMIP - the Citarum program), which is carried out by the Directorate General of Water Resources (DGWR), Ministry of Public Works as the Executing Agency.

Created Date Wednesday, 11 June 2014
Modified Date Tuesday, 28 July 2015
Filesize 18.52 MB
Category Report
Author

22 Hotspot in the Citarum River Basin

The aerial photographs used in this document visualize 22 Hotspots in the Citarum River basin, and complement the database and maps that have been compiled over the years. Instead of an orthographical aerial survey, the photographs show the different locations from angles that best ilustrate the conditions.

Created Date Wednesday, 11 June 2014
Modified Date Tuesday, 28 July 2015
Filesize 1.45 MB
Category Report
Author

Environmental and Social Safeguard Monitoring Report

The report is a quarterly Report prepared in August 2011 for INO: Loan 2500-2501-Integrated Citarum Water Resources Management Program Project 1. Prepared by Project Coordination Management Unit, Balai Besar Wilayah Sungai Citarum, Ministry of Public Works for the Directorate General of Water Resources Ministry of Public Works Republic of Indonesia and the Asian Development Bank. The report can also be downloaded at: http://www2.adb.org/Documents/SEMRs/INO/37049/37049-023-ino-smr-01.pdf