Program Component

In accordance with an integrated management principle and the objective of Water Resources Law No. 7/2004, ICWRMIP Program has been designed to implement priority activities in river basin management.  

Project components included in the investment program are selected with respect to long term strategic investment and priorities set by Citarum River Basin stakeholders through a participatory planning process. Selection criteria include: the level of importance and urgency of the planned activities; the potential contribution to an integrated water resources management; whether or not the activities may be funded by other donors or the government alone; the least possible number of implementing bodies and sectors which ADB could provide added values, or which have been partnering with the government so far.

The planned project components (outputs) are grouped into main key areas of integrated water resources management as follows:  (i) institutions and planning for integrated water resources management; (ii) water resources development and management; (iii) water sharing; (iv) environmental protection; (v) disaster management; (vi) community empowerment; (vii) data, information, and decision support system; and (viii) program management.

KEY AREAS

COMPONENT SUB-PROJECTS

1. Institutions and planning for Integrated Water Resources Management (IWRM)

1.1    Roadmap Management

1.2    Roadmap Institutional Strengthening

1.3    Institutional Strengthening for IWRM

1.4    Spatial Planning for 6 Ci's River Basin Territory

2. Water Resources Development and Management

 

2.1    Rehabilitation of West Tarum Canal

2.2    Improved Land and Water Management

2.3    Support for Community and CSO Driven Initiatives for Improved Water Supply and Sanitation

2.4    Water Supply Options for Upgrading Bandung Water Sources

2.5    Feasibility Study for Upgrading Bandung Water Sources

2.6    Detailed Engineering Design for Upgrading Bandung Water Sources

3. Kebersamaan Pemanfaatan Air

1.1    Development of Key Policies and Strategies for WRM in CRB

4. Environmental Protection

4.1    Development and initial Implementation of a Basin River Quality Improvement Strategy and Action Plans

4.2    Biodeversity Conservation and Watershed Management

5. Disaster Management

5.1    Upper Citarum Basin Flood Management

5.2    Climate Change Adaption and Mitigation

6. Community Empowerment

Addressed in parallel support Technical Assistance

7. Data, Information, and Decision Support System

7.1    Decision Support System for IWRM in Citarum River Basin

8. Program Management

1.1    Program Management

1.2    Independent Monitoring and Evaluation

Program Implementing Unit

The implementation of various components of Project 1 is the responsibility of the following Project Implementation Units (PIUs) at a national level.

 garuda

STATE MINISTRY OF NATIONAL DEVELOPMENT PLANNING /BAPPENAS

Roadmap Coordination Management Unit (RCMU)

Project Implementation Unit (PIU)

Implementer:

Directorate of Water Resources and Irrigation

Deputy of Infrastructure Affairs

Address:

JL. Taman Suropati No.2

Jakarta 10310, Indonesia

Telp : +62 021 3926186

Component Sub-Projects:

1.1    Roadmap Management/Pengelolaan Roadmap

8.2    Independent Monitoring and Evaluation/ Monitoring dan Evaluasi Independen

1.2    (TA A1) Roadmap Institutional Strengthening/

Perkuatan Kelembagaan Roadmap

 

pu

MINISTRY OF PUBLIC WORKS

 

Program Coordination Management Unit (PCMU)

Project Implementation Unit (PIU)

 

Implementer:

Balai Besar Wilayah Sungai Citarum

Ministry of Public Works

 

Address:

Balai Besar Wilayah Sungai Citarum

JL. Inspeksi Cidurian STA 5600 Bandung

Jawa Barat, Indonesia

Telp: +62 022 7564073-4 , +62 022 7513562

Fax : +62 022 7505760

 

 

Component Sub-Projects:

 

2.1    Rehabilitation of West Tarum Canal/Rehabilitasi Saluran Tarum Barat.

2.4    Water Supply Options for Upgrading Bandung Water Sources/ Opsi Penyediaan Air Minum Untuk Peningkatkan Sumber Air Baku Bandung.

2.5    Feasibility Study for Upgrading Bandung Water Sources/Studi Kelayakan Untuk Peningkatan Sumber Air baku Bandung .

2.6    Detailed Engineering Design for Upgrading Bandung Water Sources/Perencanaan Teknis Detail untuk Peningkatan Sumber Air Baku Bandung.

8.1  Program Management/Pengelolaan Program

 

3.1    (TA B3) Development of Key Policies and Strategies for WRM in CRB/Pengembangan Kebijakan Pokok dan strategi untuk pengelolaan SDA di Wilayah Sungai Citarum

 

pu

MINISTRY OF PUBLIC WORKS

 

Project Implementation Unit (PIU)

 

Implementer:

Directorate of Water Resource

Directorate General of Water Resource

Ministry of Public Works

 

Address:

JL. Patimura No. 20 Kebayoran Baru

Jakarta Selatan 12110 Indonesia

Telp: +62 021 739 7936,

Fax : +62 021 722 1907

 

 

Component Sub-Projects:

 

1.1    (TA B1) Institutional Strengthening for Integrated Water Resources Management in 6 Ci’s River Basin Territory/ Perkuatan Kelembagaan Pengelolaan Sumber Daya Air Terpadu di Wilayah Sungai 6 Ci.

                             

7.1   (TA D1) Decision Support System for IWRM in the Citarum River Basin/Sistem Untuk Dukungan Pengambilan Keputusan Untuk Pengelolaan Sumber Daya Air Terpadu Di Wilayah Sungai Citarum.

 

pu

MINISTRY OF PUBLIC WORKS

 

Project Implementation Unit (PIU)

 

Implementer:

Directorate of Spatial Planning Region II

Directorate General of Water Resource

Ministry of Public Works

 

Address:

JL. Patimura No. 20 Kebayoran Baru

Jakarta Selatan 12110 Indonesia

Telp: +62 021 725 7277,

Fax : +62 021 725 7277

 

 

Component Sub-Projects:

 

1.1   (TA B2) Spatial Planning for 6 Ci’s River Basin Teritory/Perencanaan Tata Ruang Untuk Kawasan Wilayah Sungai 6 Ci

 

pu

MINISTRY OF PUBLIC WORKS

 

Project Implementation Unit (PIU)

 

Implementer:

Research and Development Agency

Research Center for Water Resources

Ministry Of Public Works

 

 

Address:

JL. Ir. H. Juanda 193

Bandung 40135

Telp: +62 022 2501083,

Fax : +62 022 2500163

 

 

Component Sub-Projects:

 

5.1    (TA C1) Upper Citarum Basin Flood Management/

 Pengelolaan Banjir Citarum Hulu.

 

pertanian

MINISTRY OF AGRICULTURE

 

Project Implementation Unit (PIU)

 

Implementer:

Directorate of Land Management

Directorate General of Land and Water Management

Ministry of Agriculture

 

Address:

Gedung D Lantai IX

JL. Harsono RM. No.3 Ragunan

Jakarta Selatan 12550 Indonesia

Telp: +62 021 789 0043,

Fax : +62 021 789 0043

 

 

Component Sub-Projects:

 

2.1     Improved Land and  Water Management/ Peningkatan Pengelolaan Lahan dan Air.

 

 

 

kesehatan

MINISTRY OF HEALTH

 

Project Implementation Unit (PIU)

 

Implementer:

Directorate of Environmental Health

Directorate General of Disease Control and Environment Health

 

Address:

JL. Percetakan Negara No.29

Kotak Post 223 Jakarta 10560

Indonesia

Telp: +62 021 424 5778

Fax : +62 021 424 5778

 

 

Component Sub-Projects:

 

2.1     Support for Community  and CSO Driven Initiatives for Improved Water Supply and Sanitation/Dukungan Prakarsa Masyarakat dan Lsm Untuk Perbaikan Penyediaan Air Minum dan Sanitasi.

 

 

 

lingkungan hidup

STATE MINISTRY OF ENVIRONMENT

 

Project Implementation Unit (PIU)

 

Implementer:

Deputy Assistant of Lake and  River Damage Control Region II

Deputy for Nature Conservation Enhancement and Environmental Degradation Control

State Ministry of Environment

 

Address:

Gedung D Lantai IX

JL. Harsono RM. No.3 Ragunan

Jakarta Selatan 12550 Indonesia

Telp: +62 021 789 0043,

Fax : +62 021 789 0043

 

 

Component Sub-Projects:

 

4.1    Development and Initial Implementation of a Basin River Quality Improvement Strategy and Action Plans/ Pengembangan dan Pelaksanaan Awal Strategi Peninkatan Kualitas Sungai Dalam Wilayah Sungai dan Rencana Kegiatan

 

5.1    (TA E1) Climate Change Adaptation and Mitigation/Adaptasi dan Mitigasi Terhadap Perubahan Cuaca

 

 

kehutanan

MINISTRY OF FORESTRY

 

Project Implementation Unit (PIU)

 

Implementer:

Directorate of Area Conservation

Directorate General of Forest Protection and Nature Conservation

Ministry of Forestry

 

Address:

Gedung Manggala Wanabakti

JL. Gatot Subroto Senayan, Jakarta 10270

Indonesia

Telp: +62 021 572 0229,

Fax : +62 021 572 0229

 

 

Component Sub-Projects:

 

4.1    Watershed Management and Biodiversity Conservation/Konservasi Keanekaragaman Hayati dan Pengelolaan Daerah Penyangga Air